Introduction (1 hour):
- Motors
- Brushed
- Brushless
- Characteristics (KV, Poles, ...)
- ESC
- PPM/PWM
- Propellers
- Types
- Characteristics
- Test Bench
- Operating Principle
- Implementation
- Solar panel
- Main Characteristics
- Characteristics curve
- MPPT
- Constant Voltage Algorithms
- P&O Algorithms
- Increasing Conductance Algorithms
Practical work (3 hours):
- Control of ESC using Arduino
- Electrical Connexions
- Configuration and initialization of ESC
- PPM Signal generation
- Power measurement by INA219
- Electrical Connexions
- Configuration and initialization of INA219
- Measurement of Voltage, Current and Power
- MPPT Implementation: P&O Code
- Integration
- P&O Parameters adjustments
- Verification of ideal work
An attendance certificate will be provided at the end of the workshop
Content
The highlighted icons, represent the fields of education (in compliance with ISCED Classification) engaged during this course/programme.
Venue
Vigo, Spain
Application
Qualification
Objective: Acquire some basic notions on the operation and characteristics of the electric and propulsion systems of a solar radio-controlled raft. Students will also learn how to integrate and optimize them for its maximum performance
Contents information
Introduction (1 hour):
- Motors
- Brushed
- Brushless
- Characteristics (KV, Poles, ...)
- ESC
- PPM/PWM
- Propellers
- Types
- Characteristics
- Test Bench
- Operating Principle
- Implementation
- Solar panel
- Main Characteristics
- Characteristics curve
- MPPT
- Constant Voltage Algorithms
- P&O Algorithms
- Increasing Conductance Algorithms
Practical work (3 hours):
- Control of ESC using Arduino
- Electrical Connexions
- Configuration and initialization of ESC
- PPM Signal generation
- Power measurement by INA219
- Electrical Connexions
- Configuration and initialization of INA219
- Measurement of Voltage, Current and Power
- MPPT Implementation: P&O Code
- Integration
- P&O Parameters adjustments
- Verification of ideal work